About Containers

About Containers

With economical and practical solutions, Ayyıldız Konteyner aims to help your investments progress quickly, safely and smoothly, and produces custom-sized containers according to your requirements.

Originally made as a temporary solution, containers have recently been used increasingly as mountain houses, garden houses and in business sectors.

Container technical specifications:

Scope of work: Container buildings are produced in sizes of 240 cm x 600 cm and 300 cm x 700 cm depending on architectural requirements, with a wall thickness of 4 cm.

Load-bearing system: The system will have a load-bearing chassis using steel corner columns. The parts completing the main structure will be made of steel profiles, and the cover profiles used inside and outside the container will be made to be watertight.

Roof covering: 0.50 mm galvanised sheet, with 4 cm polystyrene foam on the inside and 1 cm thick panelling.

Exterior walls: The exterior wall will be 0.50 mm galvanised trapezoidal sheet, with 4 cm thick polystyrene foam inside the wall and plastic panelling on the wall surface facing the inside of the container.

Interior walls: Made with PVC panelling on both sides, with insulation provided by a 40 mm thick, density 8 expanded polystyrene foam wall board.

Exterior doors: Made of 40 mm thick painted galvanised pressed doors.

Windows: Made of PVC frames, supplied with all accessories needed for installation (hinges, window handles, seals, etc.).

Glazing: Exterior glazing will be 4 mm. Glazing in wet areas will be 4 mm frosted glass.

Painting: All components of the load-bearing steel frame will be painted with oil-based paint. All concealed steel profiles are given 2 coats of primer.

Electrical installation: The interior wiring specified in the electrical plan will be run to the fuse box in accordance with the plan. Any additional panels requested, the electricity subscription from TEDAŞ and related costs are the responsibility of the client.

Plumbing: Will be run to the building outlet in accordance with the plan. The water subscription, external connections, meter fee and related costs are the responsibility of the client.